To bridge the perimeter drainage the door threshold will cantilever from the studio floor. A UC section was used to give both a fixing for the steel floor threshold and a base plate fixing for the side wall under the door opening.


To bridge the perimeter drainage the door threshold will cantilever from the studio floor. A UC section was used to give both a fixing for the steel floor threshold and a base plate fixing for the side wall under the door opening.

