Monthly Archives: December 2006

Framing

This gallery contains 4 photos.

Temporary propping to the front facade. Plywood cladding to side walls to form cantilevers. Temporary bracing to facade. Vapour barrier and inner ply skin to rear facade.Corner prop…..

More Galleries | Leave a comment

Wall plate connection

This gallery contains 3 photos.

Rear wall. Side wall. Junction with threshold plate.

More Galleries | Leave a comment

Walls

This gallery contains 3 photos.

Walls are built on the studio floor and lifted into place.

More Galleries | Leave a comment

Door threshold

This gallery contains 2 photos.

To bridge the perimeter drainage the door threshold will cantilever from the studio floor. A UC section was used to give both a fixing for the steel floor threshold and a base plate fixing for the side wall under the … Continue reading

More Galleries | Leave a comment